2-9-1-2-ustanovka.html
2.9.1.2. Installation
|
Fig. 2.311. An order of installation of fastenings of recirculation of the fulfilled gases
|
Establish bolts and a nut of fastening of a pipe of recirculation of the fulfilled gases in the order shown in the figure 2.311.
|
Fig. 2.312. Combination of adjusting tags throttle branch pipe and air hose
|
Combine tags on a throttle branch pipe and an air hose (fig. 2.312).
NOTE
Before installation of an air duct of system of an admission, be convinced that rubber fastenings on an arm of the rechargeable battery are on the places.
At installation of an air duct of system of an admission in rubber fastenings use soap water.
|
Make sure that two rubber fastenings are established on an arm of the rechargeable battery.
Establish an air duct of system of an admission in rubber fastenings.
|
Fig. 2.313. Installation of the panel of a radiator and air duct of system of an admission
|
Using a bracket, fix the panel of a frame of a radiator and an air duct of system of an admission as shown in the figure 2.313.
|
Fig. 2.314. Installation of the socket of the RSM block
|
Completely insert the PCM block socket into the air filter and press the lever before click (fig. 2.314).
Install other components as it should be, the return to removal.
|