Mazda 3 since 2003
1. Operation and maintenance of the car
2. Engine
2.1. General description of new engines of the L8, LF and L3 models
2.2. Mechanical part of engines
2.2.1. Engines of the L8 and LF models
2.2.2. Verification of the contents of CO/CH in the fulfilled gases
2.2.3. Measurement of a compression in engine cylinders
2.2.4. Check of a belt of the drive of auxiliary units
2.2.5. General information and safety measures at removal of the power unit
2.2.6. Removal of sealant
2.2.7. Removal and installation of the power unit
2.2.8. Check of the executive mechanism of change of phases of gas distribution (L3)
2.2.9. Removal and installation of the executive mechanism of change of phases of gas distribution (L3)
2.2.10. Gas distribution mechanism drive chain
2.2.11. Removal and installation of the operating oil valve (OCV) (L3)
2.2.12. Check of the operating oil valve (OCV) (L3)
2.2.13. Check of operation of the spool-type valve (OCV) (L3)
2.2.14. The general repair operations on the power unit
2.2.15. Check of a head of the block of cylinders
2.2.16. Assembly of the block of cylinders (beginning)
2.2.16.1. Installation of covers of radical bearings
2.2.16.2. Installation of piston rings
2.2.16.3. Assembly of the piston
2.2.16.4. Installation of the conrod bearing and cover
2.2.16.5. Assembly of the balancing block (L3 with the mechanism of change of phases of gas distribution)
2.2.17. Assembly of the block of cylinders (termination)
2.2.18. Assembly of a head of the block of cylinders
2.2.19. Assembly of the drive of the mechanism of gas distribution
2.3. Appendix 1
2.4. Appendix 2
2.5. Appendix 3
2.6. The Z6 engine – a mechanical part
2.7. Lubrication system
2.8. Cooling system
2.9. System of an admission
2.10. Fuel system
2.11. System of production of the fulfilled gases and system of decrease in toxicity
2.12. System of ignition
2.13. Control system
2.14. Tables
3. Transmission
4. Running gear
5. Steering mechanism
6. Brake system
7. Onboard electric equipment
8. Body
 









1e5999b2

2-2-16-4-ustanovka-shatunnogo-podshipnika-i-kryshki.html

2.2.16.4. Installation of the conrod bearing and cover

Fig. 2.176. Installation of a connecting rod


Establish connecting rods in a head and a cover of a rod, as shown in the figure 2.176.

ATTENTION
At assembly and installation of a cover of a rod, level a rod and a cover of a rod in the area of a break.

Tighten conrod bolts in two steps.
Inhaling moment:
- the first reception – 26–32 N · m;
- the second reception – 80–100 °.

"previous page
2.2.16.3. Assembly of the piston
following page"
2.2.16.5. Assembly of the balancing block (L3 with the mechanism of change of phases of gas distribution)